They examine the digital cupboards of Nueva L-1

by times news cr

2024-06-13 03:40:09

To confirm the progress of the works within the second part of renewal of Line 1 of the Collective Transportation System (STC) Metrowhich incorporates the part Salto del Agua-Observatorycapital authorities carried out a supervision tour on the Central Management Publish II (PCC II).

Through the inspection, Andrés Lajous, Secretary of Mobility, and Guillermo Calderóncommon director of the Metro, visited the set up of digital cupboards in PCC II, that are a part of the redundant system for controlling practice site visitors on the pink line.

Calderón defined that the redundant gear for the management and signaling of Line 1 is put in in PCC II, amongst that are backup batteries for the servers, that are referred to as UPS gear, that are activated in case of any interruption within the provide {of electrical} vitality.

As well as, they verified the management panels of vitality, regulation and telecommunications.

The proprietor of the STC recalled that the brand new PCC I used to be put in within the C5the place practice site visitors on strains 1 to six is regulated. Within the particular case of the gear put in on this website, a redundant system is obtained.
He additionally introduced that the PCC I servers that labored for the Line 1 earlier than controlling it from C5can be used for Line 7.

For the transforming of L1, the capital authorities invested 37 billion pesos for the acquisition of 29 trains, monitor alternativesleepers and ballast, renewal of technical gear and updating the toll system, so entry is solely with the MI card.

2024-06-13 03:40:09

You may also like

Leave a Comment