2024-06-20 00:41:44
The Central Effluent Remedy Plant (CETP) of Savar Leather-based Industrial Metropolis has been totally ready and operational, stated Zakia Sultana, Senior Secretary, Ministry of Industries.
On Tuesday (June 18), he stated this stuff in response to the questions of the journalists current in the course of the go to to Bisik leather-based business in Hemayetpur, Savar, Dhaka.
The secretary stated, this time CETP of Bisik Leather-based Industrial Metropolis has been totally ready and carried out. All its modules have been overhauled and completely examined and repaired. The liquid waste is handled with vital chemical compounds. Furthermore, organic therapy system is in operation. It’s ensured that no tannery waste reaches the CETP with out main therapy.
He stated, we now have come right here with our whole group from the Ministry of Business. The Extra Secretary of the Industries Ministry is right here, the BCK Chairman is there, the Client Rights Officer is there, we now have all come collectively to mainly see the pores and skin that has been sacrificed. Numerous initiatives have been taken to completely put together the CETP that’s right here. We’re right here to see it first hand.
Zakia Sultana stated, each tannery proprietor has been advised that in the event that they launch any water with out therapy, then the authorities won’t give them any extra water. In view of which we now have seen your entire CETP, we now have been bettering over the previous couple of years, come again to this CETP repeatedly. I noticed how the choice of the duty pressure was carried out by all involved.
He stated, we stated why the pores and skin won’t penetrate with out making use of salt. I noticed that too, this time it has improved. Within the final 63 years, the best quantity this yr is 24 lakh 37 thousand tons. In consequence there isn’t any scarcity of salt. And for this, a grassroots marketing campaign has been carried out via the native administration. As a result of the capability of our CETP is 25,000 liters, the stress will probably be much less. That is why I stated, the outer pores and skin of Dhaka won’t enter right here for seven days. In consequence, the stress on the CETP won’t be created if the pores and skin comes steadily. We’re getting good outcomes from it.
He additionally stated that we now have determined to make CETP-2 in Dhaka and another CETP in Chittagong. If that is accomplished, we are going to obtain our annual goal of 1 crore leathers at sacrifice and one crore extra all year long, totaling the capability wanted to course of two crore leathers.
The secretary stated, we’re working to attain the capability of LWG. A number of tanneries have already launched chrome restoration items. Thus if all tanneries begin chrome restoration items, we are going to go forward with it.
He stated that the 4 directives of the Excessive Court docket relating to the leather-based business are being duly adopted. Giant tanneries have already arrange chrome restoration items (CRUs). Different parameters besides chromium and organic oxygen demand (BOD) within the handled effluent are inside specified limits. To find out and management the proper high quality of the handled liquid waste, the checks will probably be carried out within the Division of Atmosphere in addition to within the Science Laboratory and our personal laboratory.
Through the go to, BCIC Chairman (Grade-1) Sanjay Kumar Bhowmik, Director Basic of Nationwide Client Rights Safety Directorate AHM Safikuzzaman, Extra Secretary of the Ministry of Industries Kamrun Nahar Siddika and Md. Shamimul Haque and others had been current.