The Val Pusteria railway reopened: many trains canceled – Pusteria Gardena Badia

by times news cr

2024-06-23 00:30:22

BOLZANO. The Val Pusteria railway line was reopened at 4.30pm right this moment, Saturday 22 June, having been interrupted since 11.30am as a consequence of a technical fault on the facility line between Brunico and Valdaora.

The fault triggered quite a few practice cancellations. This morning a hiker seen {that a} stay electrical cable was mendacity on the trail that winds alongside the Rienza river gorge. A 20,000 volt medium voltage line cable following final night time’s sturdy wind it had been torn down and ended up on the overhead line of the railway. The Brunico firefighters who adopted the operations noticed the realm with a drone, discovering that the broken part was roughly 350 meters lengthy. In collaboration with the supervisor of the Edyna electrical energy line, the mayor of Brunico Roland Grießmair, the supervisor of the railway community RFI and the carabinieri, the restoration of the affected part was organized.

In settlement with the mayor of Brunico they had been cycle paths and paths closed in and thru the Rienza Gorge for security causes. On account of unhealthy climate on the Val Pusteria railway line, there have been additionally cancellations on the Fortezza – Brunico route.


2024-06-23 00:30:22

You may also like

Leave a Comment