For the duration of the repair works, traffic restrictions have been introduced on 70 sections of national highways / Day

by times news cr

2024-07-09 15:59:52

LVC calls on drivers to observe the traffic restrictions in them and not to drive in reverse traffic sections at red lights – this creates dangerous situations, endangering both motorists and those working in the construction work zone, violators also create traffic jams in places where it is impossible for transport to change, resulting in even greater delays on the road.

The most construction works are currently taking place on national highways of local importance – 26 sections, and on regional highways – 22 sections.

There are five sections of traffic lights or traffic controllers on the national regional highway Alūksne-Ape (P39) from Alsvikai to Galdusil (km 7.92-14.99). Even up to 50 minutes should be calculated on the additional way.

When leaving, residents are invited to look at the construction work map on the website of VSIA “Latvijas Valsts ceļi” (LVC) “www.lvceli.lv”, where information is available on all stages of construction work and their restrictions, and to plan additional time on the road if you have to cross the construction site.


2024-07-09 15:59:52

You may also like

Leave a Comment