Jacques Chirac Park Nîmes: Tree Felling Controversy – Town Hall Responds

by priyanka.patel tech editor

Nîmes Park Project Sparks Controversy Over Tree Felling

A dispute is brewing in Nîmes, France, as local associations voice concerns over the removal of trees during the development of the future Parc Jacques Chirac, a 15-hectare green space. The project, located between Boulevard Natoire and Boulevard Allende, has drawn criticism from environmental groups who allege the scale of tree removal contradicts initial agreements.

Two months after construction began on the former Pichon nurseries, several organizations – including ARBRES, Mémoire verte, and Gardiens de l’ombre – have publicly denounced the felling of multiple trees. The planned park, renamed in honor of the former French president, aims to transform a neglected area into a vibrant urban oasis. However, activists claim the current approach prioritizes aesthetics over genuine reforestation.

“What we are seeing is not what was agreed upon,” stated a representative from the A.R.B.R.E.S. association. “We expected a more heavily vegetated space, but beautiful trees have been cut down. It seems only small groves are being preserved, likely for decorative purposes. This is not what was envisioned.”

Local authorities, however, defend the actions as necessary for public safety and regulatory compliance. Chantal May, the delegate assistant responsible for green spaces, insists the project remains on track and is being overseen by qualified professionals.

May explained that removing trees is sometimes unavoidable when creating a safe urban park. “If we want a secure urban park, we must remove everything that is dangerous,” she said. “You cannot plan a playground without removing some trees. Furthermore, the DREAL [Regional Directorate for the Environment, Planning and Housing] requires us to build retention basins to protect residents of Nîmes from flooding. We have no choice.” She added that many of the removed trees were small, and that areas lacking substantial tree cover are being repurposed for the basins.

The city is attempting to reassure the public by highlighting plans to plant a “forest” of 1,600 trees within the park upon completion of the initial construction phase. May emphasized the presence of an on-site ecologist who advises on tree removal, and the practice of leaving felled wood on the ground to promote biodiversity and insect migration. She also noted the extensive cleanup operation underway, as the Pichon nurseries had been left untended for decades, requiring significant clearing – sometimes with machetes – to access densely overgrown areas and create pathways.

The situation underscores the complex challenges of balancing urban development with environmental preservation. While authorities maintain the project will ultimately enhance the city’s green infrastructure, concerned citizens remain skeptical, demanding greater transparency and adherence to original commitments.

Leave a Comment