Construction site collapses in Cuauhtémoc; worker trapped under beam

by times news cr

A ‌23-year-old man was rescued ⁢by emergency services after the collapse of a construction⁣ site that left him​ trapped under the ‌rubble, in the mayor’s office Cuauhtémoc.

The incident occurred inside a construction site on Lerma Street where emergency services were called. Upon arrival, they were told⁤ that a person was⁣ trapped under a beam inside the building.

Staff of the Rescue and Medical⁢ Emergency Squad worked in coordination with firefighters to remove the construction ​material and ‍perform‌ the ‌rescue operation.

You might be interested in: Mexico⁣ City Metro Line ​1: When will it open?

After moving the stones,‍ emergency services were able to rescue the 23-year-old. He was transported to ground‍ level on a stretcher and evaluated. Medical assessment revealed an exposed fracture of the tibia and fibula of his left leg.

Due to the severity of the injuries, the construction worker was taken to a hospital for specialized medical care.

The⁣ emergency response caused temporary road ‍traffic congestion in the area to facilitate the passage of⁢ rescue units. Normal traffic flow was ‌restored after​ the rescue operation was completed.

You may also like

Leave a Comment