Dawai lays the foundation stone for the Batira project (wastewater payment line)

by time news

We present to you, our esteemed followers, this news entitled: Dawai lays the foundation stone for the Batira project (wastewater payment line) Which was published on our website on 2023-03-14 07:21:35 . And now to the details.

The Independent/- Ali Qassem Al-Kaabi/..The Governor of Maysan, Ali Dawai, laid the foundation for a payment line project to divert wastewater from the Batira treatment plant to drainage leading to the Dimah depression west of Amarah.

In his opening speech, the governor said: The project is the implementation of a polyethylene payment line with a diameter of (800) mm and a length of (22) km. It contains (10) submersible pumps with a discharge capacity of (1250) m3 each. These pumps transport treated water from the station. The project was also equipped with an electric transformer with a capacity of (1) megabyte, and a bridge crossing for the project that crosses the pipe over the Al-Batira River, with a discharge capacity of more than (100) thousand cubic meters.
He added: The project aims to convert the Al-Batira water treatment unit, which treats the sewage water of the right side of the city of Amarah, into a large wastewater that leads to a low-density marsh. Solving an environmental and health problem in the areas of the Al-Batira River and preventing pollution of the river’s running water due to water scarcity

Dawai lays the foundation stone for the Batira project (wastewater payment line)

Note: This news, Dawai lays the foundation stone for the Al-Batira project (wastewater payment line), was first published on the Al-Mustaqila website, and our website does not bear its content in any way.
You can see the details of the news as it was reported from (The source of the news)

Information about the news: Dawai lays the foundation stone for the Al-Batira project (wastewater payment line)

Above, we presented to you details and information about the news of Dawai laying the foundation stone for the Al-Batira project (wastewater payment line). We hope that we have been able to provide you with all the details and information about this news, which was published on our website in the Iraqi News section.

It is worth noting that the editorial team transmitted the news and may have modified it or quoted from it, and you can read and follow the developments of this news from the source.

You may also like

Leave a Comment