Haritha Kerala Mission revives 406 km of canals | haritha Kerala Mission

by time news

Haritha Kerala Mission revived 406 km of canals

Kasargod: Green Kerala by copying various groups. 406.25 km of canals were rehabilitated by the Mission. In addition, upgrade of 473 ponds, 1016 new ponds and 2666 wells. Charging and Canal Upgradation 84, 89408 Upgrading of Rainy Areas And so on. Five rivers to be rehabilitated under Kasargod development package Work is underway to expand. The Ring Check Dam being implemented under the Employment Guarantee Scheme is a different project. It’s bloody. The normal rainfall availability in the district is 3587 mm. This is higher than the state average. In addition, 12 rivers (14.42 sq km), 1,200 ponds, 640 canals and hundreds of rivers. The district is not waterlogged with many tunnels.

Most of the rivers in the district are submerged due to salt water intrusion. Shik is being harmed. A lot of land is left uncultivated. Many of the existing checkpoints in the district are not functional. Conservation of water resources will be considered in the Fourteenth Plan. Under the leadership of the Mission, all the Local Government Institutions in the District were watered down. The master plan has been prepared. It has made the necessary additions to it and based on that. Water conservation activities need to be done in a feminine manner. Due to the geological significance of the district, it is rapidly flowing. Arrangements have to be made for storage of rain water.

Qualiform Bacteria in Manchurian, Uppala and Chittari rivers in the district The size of is above the specified limit. The rest of the rivers and streams are not polluted. During the summer, a lot of money is spent on drinking water. Drinking water and bathing after scientific purification of river water in the district Innovative systems for use in kitchens and home appliances The land will be included in the scheme.

.

You may also like

Leave a Comment