2024-05-18 21:05:29
BOLZANO. On the night time between twenty second and twenty third Could 2024, the SS48 might be closed from 9pm to 5am, at Doladizza, for the positioning of two cycle bridges.
Work has been underway since October 2023 to enhance, safe and widen the highway part between km 8+150 and km 8+550 of the SS48 of the Dolomites, within the locality of Doladizza, within the municipality of Montagna.
Specifically, the development of two crossings for the cycle path and the variation of the bus stops are deliberate.
Because the challenge supervisor defined Stefano Maraner (Central/Southern Roads Technical Workplace), after the contractor has ready, in latest weeks, all of the helps of the 2 pedestrian and cycle bridges for crossing the SS48, the metal constructions of the 2 bridges might be positioned of their location between the 9pm on 22 Could and 5am on 23 Could 2024. For this function, the Provincial Roads Service issued the order for the full closure of the SS48 from km 7+400 to km 8+400 in the identical time slot. On-site diversion.
2024-05-18 21:05:29