Submerged railway bridge blocked traffic for 3 days | Dinamalar

by time news

In Erode district, it has been raining widely for a few days. In this, the rain water falling in the areas including Modakurichi, Nansey Uthukuli, and the Savadipalayam railway entry bridge area.
is coming
Due to this, the water overflowing the bridge to a height of several feet, flows into the Kalingarayan canal. Due to this, the traffic through the bridge has been stopped for the last three days.
The people of the area said:
There is no proper drainage facility for rain water. From areas such as Modakurichi, Nansey Oothukuli to Karur road
A lot of people come and go through every day. Now two-wheelers and cars and autos are not able to go because the rain water is rising several feet. After the rainwater drains off, drainage facilities should be provided in the area.
Thus they said.

Subscribe Dinamalar channel for new news

Advertisement

You may also like

Leave a Comment