The arrival of materials for the first unit at Al-Khums power station

by time news

Libya News 24

It arrived at eight units loaded with materials for the rotary air heater of the third unit at Al-Khums power station, in preparation for the start of installation work.

The General Electricity Company said that the installation work will be carried out by the technical teams according to the two-shift system to expedite the completion of the maintenance work of this unit and return it to the electrical network with its full load.

She added that this comes within the framework of the great and continuous efforts made by the company’s board of directors to support the electrical network, maintain its bid pattern, and increase its production performance.

You may also like

Leave a Comment