The Civil Protection is predicting flooding in Rio do Sul and opens the primary shelters within the metropolis

by time news

Rua Wenceslau Borini, within the neighborhood of Canta Galo, at 1pm this Saturday (Photograph: PMRS, Disclosure)

The town of Civil Protection“>Rio do Sul has reported that it expects flooding within the metropolis this Saturday (18). In accordance with the Civil Protection, if the rain proven by meteorological fashions is confirmed, the extent of Itajaí-Açu might attain between 7.5 and eight.5 meters. Because of this, the residents of the decrease areas are affected.

Follows after promoting

Get information from Blumenau and the area by way of WhatsApp

In accordance with town corridor, the flood degree is 8.5 meters. The warning degree is 9.5 metres, when there’s a reasonable risk of flooding. 4 shelters are open within the metropolis in case individuals turn out to be homeless.

Some streets in Rio do Sul start to flood when the water reaches 7 meters. At midday, when Itajaí-Açu was at 5.79 meters, entry to Rua Wenceslau Borini by means of the bridge over the Ximbica river was already closed. At 7.5 and eight meters it begins to achieve homes.

The advice is that residents of those areas put together for flooding and, if needed, search shelter. The 2 constructions are open within the neighborhoods of Bela Aliança and Taboão, those most prone to flooding.

Follows after promoting

Rain within the area has already exceeded 120 millimeters within the final 24 hours and the forecast is for much more rain this Saturday. On Sunday, the quantity must be drastically lowered. It’s doable to observe the extent of the Itajaí-Açu River in Rio do Sul, in addition to the extent of dams and the extent of avenue flooding official website from Rio do Sul Emergencies should be reported on 199.

Dams

At midday, all seven gates on the Taió dam had been closed to retain rainwater. The reservoir occupancy proportion was 2.6%.

As for Ituporanga dam, one gate is closed whereas the opposite 4 are open. They can’t be closed as a result of they’re present process upkeep as a result of injury attributable to final 12 months’s floods. Nevertheless, rain is a part of the construction, as a result of the circulation of water passing by means of the open ducts is decrease than if the passage had been straight.

Learn extra

Santa Catarina has an orange alert with as much as 120 mm of rain this weekend

Dredging work begins in Rio do Sul, which ought to scale back the affect of flooding within the Valley

You may also like

Leave a Comment