He Mexico City Metro (CDMX) your service is affected today Friday December 27since this morning they reported a convoy was evacuated of passengers in the Line 3while in the Tacubaya station of Lines 1, 7 and 9 was detained a alleged kidnapper.
After 7:30 in the morning, the daily report from the CDMX Metro indicated a flow of less than 7 minutes to board a convoy on all routeswhich was rejected by users.
Additionally, and given the doubts of users, it should be said that the station Plinth of the Line 2 remained open and offering service throughout December 27.
At night, it was reported that a group of users were rescued by CDMX Metro personnel because for several minutes, They were trapped in an elevator of the Chabacano station.
CDMX Metro: Users trapped in the Chabacano station elevator on Line 2 are rescued
This Friday night it was reported that at least four people were rescued after They will be trapped inside the elevator which is located at the Chabacano station on Line 2 of the CDMX Metro.
According to reports, everything originated after the elevator had a mechanical failureso the presence of maintenance personnel from the CDMX Metro was required.
Upon arrival these They managed to manually open the elevatorin order to rescue and save the four people.
Personnel from the Secretariat of Comprehensive Risk Management and Civil Protection arrived at the site (SGIRPC), who will help in checking the elevator to prevent this situation from happening again.
The four people trapped They did not present any injuriesso they continued with their trip after being rescued at the Chabacano station on Line 2 of the CDMX Metro.
CDMX Metro: Line 9 presents slow movement; Line 8 with delays due to metallic objects
He Metro CDMX reported that the Line 9 kept slow walking due to the withdrawal of a train for overhaul; This caused delays in stations such as Tacubaya, according to complaints from users on social networks.
On the other hand, he reported that the advance of the Line 8 She was detained to be able to remove a metal object on the tracks; The CDMX Metro asks to take care of belongings during transfers through its facilities and prevent them from falling onto the tracks so as not to affect passage.
CDMX Metro: Alleged baby kidnapper arrested at Tacubaya station
The facilities of Metro CDMX were the scene of rescue of a baby and arrest of a womanidentified as Alison “N” 22 years oldwho would have kidnapped the minor during a party celebrating Christmas.
The baby was kidnapped on December 24 at a home located in the Pólvora neighborhood, Álvaro Obregón mayor’s office, where a party was held and A woman took advantage of the hustle and bustle to take the minor.
A day later, the victim’s mother received messages in which the kidnapping of his daughter was confirmeda situation for which he went to the Secretariat of Citizen Security (SSC) to demand money in exchange for the rescue of the minor.
However, yesterday, December 26, the police mounted an operation in the vicinity of the Tacubaya station on Lines 1, 7 and 9 of the CDMX Metro, where a woman was located in the company of the kidnapped baby, a fact for which proceeded with his arrest and transfer to the Public Ministry corresponding, while the minor was rescued.
Metro CDMX: Unit on Line 3 evacuated
Today December 27the Line 3 of the CDMX Metro has delays in its service after 7:30 in the morning, a situation that generates reports on public transport social networks.
“Gentlemen, if you are going to be wasting time on line 3 towards the university, at each station you are wasting time between three to five minutes more than necessary at the station, let us know so that people can look for another faster alternative, why do you look like turtles?” ”
Metro User
“What is the justification for Line 3 to be so slow on a day without so many users? From 5 to 10 minutes of waiting per station and there are no users at the stations”
Metro User
“Stop being stupid in L3, we are stuck in Zapata for more than 10 minutes”
Metro User
The staff of Metro CDMX explained that the delays were caused because a passenger unit was taken for inspection:
“Good day. The movement of trains on Line 3 is speeded up, after checking a train, it allows the free closing of doors, as well as getting off the car before entering.
Metro CDMX
CDMX Metro: Service schedules on December 31 and January 1
He Metro CDMX will modify your service hours for the upcoming New Year celebration December 31 and January 1as reported by the Ministry of Mobility (Semovi) of Mexico City.
In that sense, the schedules will be the following:
- On December 31 there will be service from 5:00 a.m. to 11:00 p.m.
- On January 1 the hours will be from 05:00 to 00:00.
CDMX Metro: Line 1 and Line B are still under maintenance
The Line 1 of the CDMX Metro is located in maintenance from November 18, 2023; in January 2024 Line B joined these works, while the Line 9 restarted operations from Pantitlán to Ciudad Deportiva on September 10.
However, also due to maintenance work at the STC, the following are currently closed: Line 1 stations:
- Balderas
- Cuauhtemoc
- Insurgents
- Sevilla
- Chapultepec
- Juanacatlán
- Tacubaya
- Observatory
While in the Line B 6 stations remain in maintenance work since January 18, but this does not affect users since the jobs are at night:
- Morelos
- Saint Lazarus
- Flores Magón
- Rosemary Rubio
- Oceania
- Sports Oceania
In this sense, a provisional service of the Passenger Transport Network was installed (RTP) on both routes. The cost to board a unit is 5 pesos and the transfer is free with an Integrated Mobility card.