DRC: Sicomines operates with its personal hydroelectric energy station

by time news

2024-06-14 05:13:38

Within the DRC, the mining sector experiences an electrical energy deficit that varies between 500 and 1000 megawatts, based on the Chamber of Mines. This makes native manufacturing of sure metals troublesome. To treatment this, Sicomines, a three way partnership ensuing from the Sino-Congolese settlement, has opted for independence. It has taken over the hydroelectric energy station of Busanga, the very best dam within the Congo.

From our correspondent in DRC,

Two mountains had been positioned. Between them, a small river has grown in quantity. The Busanga hydroelectric energy station attracts its water from the Congo River. On the exit of the water of the reservoir, a dam 14.5 meters lengthy, larger than that of Inga. ” We began building in 2017 and completed in September 2021, i.e. 4 years of labor, defined Adam, director of the Chinese language firm Sicohydro which constructed this infrastructure. It’s a double-curvature dam made from roller-compacted precision. The best worth of the Congo. »

Dam larger than Inga

On the backside of the mountains sits a strong energy station with 4 generators every producing 60 megawatts.” Immediately, the put in capability is 240 megawattsdefined Jean Zeng, Sicohydro guide. We swap with 4 generators, relying on the water stage. When the water is low, a machine can cease. »

Within the Katanga area, the Nationwide Electrical energy Firm doesn’t have the capability to satisfy the robust demand from the mining sector, a big client of electrical energy. What motivates them mining home Sicomines to construct its personal hydroelectric energy station. ” Sicomines wish to be free of fireplace, explains Germain Pungwe, president of employers in Kolwezi. We’re in an space the place many mining corporations are concentrated, which produce greater than 60% of our nation’s copper and cobalt, they usually want a number of electrical vitality to run their machines. Sadly, they face a scarcity {of electrical} energy. »

Apply for mining

The challenge encourages different personal actors, particularly for technical fields. ” It’s higher to get inspiration from others and, maybe, enhance, feedback Eric Monga, director of Kipay Ennery firm and head of one other hydroelectric energy station in Sombwe. For instance, bolstered concrete is similar model that we’d use at house. So it’s good to know the way they combine, it is best to keep away from overheating, and so on… »

Positioned greater than 100 km from Kolwezi, this hydroelectric plant is a brand new challenge constructed within the DRC forty years in the past, at a price of $655 million.

Learn once moreDRC faces the problem of its electrical energy provide

#DRC #Sicomines #operates #hydroelectric #energy #station

You may also like

Leave a Comment