Final yr, the nuclear energy plant began working for the primary time at 98 % capability. Purchase Sanosyan – 2024-06-23 22:55:49

by times news cr

2024-06-23 22:55:49

On account of the enlargement course of, 441 settlements had been united in 38 group clusters, Minister of Territorial Administration and Infrastructures Gnel Sanosyan introduced in the course of the dialogue of the 2021 state finances annual report within the Nationwide Meeting.

In line with him, the method offers optimistic results and they’re seen, ranging from value discount, extra bold initiatives by communities, and so forth. In 2021, 64.6 billion drams had been offered as subsidy for communities. For 2021, Gnel Sanosyan considers the adoption of the technique of the power sector, which is till 2040, an necessary achievement.

“Now all our actions are primarily based on that technique. Final yr, it was necessary to fee “Armpower” thermal energy vegetation with a capability of 254 megawatts, which play an necessary function in our power system. There was a giant funding, it was about 250 million {dollars}, many roles had been created, and the GRP of this thermal energy plant is excessive,” he mentioned.

The minister talked about that he has an necessary statement relating to the nuclear energy plant. “Annually, the nuclear energy plant stops at sure intervals and goes by a sure restore part. Final yr was fairly an intensive part, modifications happened in necessary areas, in the long run we had an necessary achievement: since 1995, the nuclear energy plant has been working at 92 % of its capability, and final yr after capital modifications, it began working at 98 % of its capability for the primary time. introduced Gnel Sanosyan.

You may also like

Leave a Comment