Germany has pledged EUR2.9 million, or about N$54 million, to help Namibia drill boreholes in drought-affected communities before the 2026/27 rainy season.
During a courtesy call at the Office of the Prime Minister on Monday, Thomas Wimmer, the German Ambassador to Namibia, revealed the financial support to Prime Minister Elijah Ngurare.
The financial contribution arrives as El Niño conditions increase the risk of severe drought, extreme heatwaves, and water stress across Namibia.
- Germany pledged EUR2.9 million, or about N$54 million, for emergency borehole drilling.
- German Ambassador Thomas Wimmer announced the funding on Monday.
- Prime Minister Elijah Ngurare directed his executive team to fast-track the project.
Funding Rollout and Infrastructure Realities
Prime Minister Ngurare directed his executive team to coordinate with relevant authorities to fast-track the project and ensure boreholes are drilled without delay to improve access to potable water in affected communities.
The German contribution is expected to increase funding for accessing clean water projects in vulnerable communities. The funding follows an appeal by Ngurare for international support to mitigate the effects of El Niño.
Characterized by warmer-than-average ocean temperatures in the central and eastern Pacific, El Niño is a naturally occurring weather phenomenon. Forecasting a strengthening of El Niño, the Namibia Meteorological Service issued a warning in October regarding severe heat and scarce rainfall for the 2026/27 rainy season.

Local inhabitants contend that sinking more boreholes fails to address the water shortage if current installations remain non-functional. To help support local water supplies, the Rundu Town Council has put down 21 boreholes.
Nevertheless, questions persist concerning the operational readiness of certain sites alongside bottlenecks in linking them to the main distribution grid. In October 2025, Tumweneni residents raised concerns that four boreholes drilled in April 2024 had remained non-operational. Boreholes in the southern part of Ndama were also reported to be awaiting further infrastructure connections.
“We unfortunately need funds to fully implement our strategic plan and transform Rundu into a city of diverse opportunities and a centre of socio-economic excellence,” Rundu chief executive Olavi Nathanael said.
Marcellius Mukuve, a resident of Tumweneni, raised doubts about the necessity of planning additional boreholes given that some previously sunk water sources in the district were said to have been left unused.

Markus Siwarongo, a resident of Ndama, expressed the community’s need for operational water systems rather than extra boreholes that remain cut off from the distribution network.
At Neyuva, concerns have also been raised over water quality. Paulus Shikusho, the head of Neyuva Senior Secondary School, said the water had excessive salinity for standard use regarding three local boreholes, and questioned if proper water-testing protocols were carried out before their activation.
In the meantime, another Rundu local, Paulus Ndjamba, said he was grateful for the financial aid from Germany while calling on officials to prioritize finalizing ongoing projects, upkeeping existing facilities, and guaranteeing dependable access to clean drinking water for local populations.
Water Pressures Across Regions
The country continues to face severe water losses through ageing infrastructure and evaporation, according to figures revealed at the third Namibia Regional Water Symposium by agriculture, fisheries, water and land reform minister Inge Zaamwani last week, who said that Namibia loses more than 50% of its water through these factors.
Local animal herders at Nsundwa village, situated within the Kabbe South constituency of the Zambezi region, have welcomed a newly fitted 65-metre-deep borehole that caters to livestock needs across five neighbouring settlements.
Sunk at the beginning of 2024 and equipped last month roughly two kilometres from the river, the borehole enables herders to reach water nearer to their settlements without driving livestock all the way to the riverbanks. Two additional 35-metre-deep boreholes were fitted at Lusese Crush Pans 1 and 2 this past July, with public access granted once the mandatory retention phase concludes.
Zambezi regional head of rural water extension services Betty Muyatwa said the Nsundwa borehole currently provides water suitable only for livestock, noting that the water will need further testing and treatment before people can safely drink it.
The developments were assessed by a Cabinet secretariat delegation from the Office of the Prime Minister during a field monitoring visit taking place from Monday to Friday to evaluate the progress of government-approved projects, their benefits to communities and challenges that need attention.