Unanimous “no” within the EIA for hydroelectric in Raftanitiko – 2024-05-24 21:11:03

by times news cr

2024-05-24 21:11:03

Editorial RoomCurrent Affairs

The municipal council of the Municipality of North Tzoumerka gave a unanimous adverse opinion on the content material of the Environmental Impression Research (EIA) file for the small hydroelectric mission, with a capability of 0.99 MW, within the tributary of Arachthos Raftanitis, judging the research to be incomplete and estimating that the development of the mission will trigger environmental degradation.


In his presentation, the mayor of North Tzoumerko, Nikos Vaitsis, identified that the biggest a part of the mission is situated in a delicate vacationer space, very near the confluence of Raftanitis and Arachthos, and the interventions will disrupt the picture of the realm and create an issue for the broader vacationer picture . He additionally referred to the shortcomings of the ichthyological research and centered on the supply for the development of a highway that may cross the stream, which on some days of the 12 months is especially torrential and harmful, stressing that crossing a highway inside the mattress of a stream or river is ex by definition a mission that requires settlement, through which case the EIA ought to be accompanied by an in depth description of the technical, which is to be constructed on the stream mattress, and by an analytical research of demarcation-settlement of the technical inside the mattress.
“Crossing the highway from the mattress of Raftanitis is prohibited, the development will trigger degradation of the atmosphere, whereas the submitted research is not less than thought of incomplete”, he concluded, together with his place being agreed by the physique as an entire.

You may also like

Leave a Comment