Pravesh Singh, Greater Noida: A big update has come out regarding Yida City of Greater Noida, Uttar Pradesh. In Yida City, which is going to be established with world class facilities, there will be no situation of dispute over garbage like in Noida and Greater Noida. Yamuna Authority has already planned for this. The authority will establish a decentralized system for garbage disposal in the entire Yida City. Under this, there will be complete arrangements for collecting, segregating and disposing of garbage in every sector and every big block. This arrangement will be there in all categories of sectors of Yida City. If the sector is small then this plant will be set up at one place and if the sector is big then such plants will be established in every block, so that the garbage can be disposed of in the same area and the garbage does not get collected.
big step on dry waste
YIDA is going to take big steps regarding disposal of plastic and dry waste. Due to this, three plots will be reserved in each and every big sector block for the disposal of dry waste generated from houses. For which, according to the present plan, about 100 plots of 1000-1000 square meters will have to be reserved. Out of these, 20 plots have been reserved, the scheme for which will also be drawn up in the next some time. The remaining 80 plots will be reserved further.
Smart city will be established
Yida area is being developed under Smart City. An international level film city is being built here along with an international airport. Apart from this, land has been allotted to big hospitals and educational institutions. The authority is soon going to launch a scheme of 20 plots in residential, industrial and institutional sectors for plastic recycling.
Will get land subsidy
Applications will be invited under Request for Proposal (RFP) to set up the plant. At present, it is being planned that up to 50 percent land subsidy can be given to the applicant in the plot. The authority will also take this proposal to the board meeting this time.
Separate plant will be set up for MDP
A plant will also be set up for the Medical Device Park to be developed on 350 acres in Sector-28. Bio medical waste can be disposed of here. This plant will be set up in eight thousand square meters. The responsibility for preparing its DPR has been given to E&Y company which will submit the DPR in 20 days.
Various types of medical equipment will be manufactured in the Medical Device Park. Here, waste from various equipment including radioactive and gamma radiation will be generated, for the disposal of which a dedicated plant will be set up.