EH Bildu says that wind power plants will be “necessary”

by time news

Arnaldo Otegi this Saturday in Bilbao / EP

The formation has presented this Saturday in Bilbao its document ‘Energy Strategy. For an ecosocial transformation in Euskal Herria’

Jorge Sainz

EH Bildu presented his document ‘Energy Strategy. For an eco-social transformation in Euskal Herria’, in which they allude to wind farms and say that “it will be necessary to have wind generation plants of a certain size in order to achieve the objectives proposed in this strategy”.

The text, presented by its leader, Arnaldo Otegi, who was accompanied by the Basque parliamentarian and expert in this area, Mikel Otero, points out that wind energy “is one of the key technologies in the energy transition” that he considers necessary. He estimates the generation objective of this technology for 2045 at 12,500 GHh / year, and for this, “4,000 MW of wind power installed in the Basque Country” are required.

Some reflections that occur at a time when EH Bildu is open to being flexible with the projects of two new wind farms in Gipuzkoa of the Norwegian public company Statkraft, which affect municipalities under its domain such as Azpeitia, Errezil, Zestoa or Aramaio , with some neighborhood opposition. In this sense, the document talks about “fitting the facilities in suitable places” and excluding “environmentally sensitive spaces”, and doing this process “with the people”.

You may also like

Leave a Comment